16
The Town Board has scheduled an informational meeting on the proposed change to the route of the water pipeline that Kiryas Joel is installing.  The new route includes the laying of pipe in Holloran Road and Palomino Place. The meeting is scheduled for Tuesday, July 17 starting at 7:00 PM at Munger Cottage. The engineering firm for Kiryas Joel will make a presentation on the proposed changes and the Town of New Windsor will have a representative at the meeting. In addition our town engineer will be present.
Actions: E-mail | Permalink |